It is likely that the capture range for the date needs to be adjusted. This is done from the raw data view. From the PrintBoss Master Application screen, go to File, then Open Document Work File. Then Browse, and View. Hold down the Cntrl key & R to view the Raw Data. Click on the box to Show Assignments. There is a grey + at the beginning of each object. The + must be included in the capture area.
0 link
DougWB
Posts: 1


3/8/2016
DougWB
Posts: 1
I am using Sage 50 and PrintBoss. I am able to produce an almost perfect check, except it does not have the date. Just MMDDYYYY.

When I change print settings and print to a local printer (without going through the printboss driver), the date is there. So, Sage50 is sending the date, but PrintBoss is not putting it onto the paper.

I've looked through the settings, configuration, etc. and can't find any checkbox or field that asks about printing the date.

Anybody have a solution?